Home Renovation in [City] — Fixed Quote, Fixed Date | [Firm]
[Company Name] Home renovation · [City]
[XXX]+ renovations · [City] since [20XX]

Renovation without the part where it stops for three weeks

Fixed-price contract from a detailed survey, a named site supervisor, and a daily photo log. We open up walls before quoting so the "unforeseen" list is short — and we tell you what could still be behind them.

Estimate my renovation Book a survey
[XXX]+
Homes renovated
[XX]%
Finished within [10]% of quote
[5] yr
Workmanship warranty
Before
After
How we keep the price honest
[Exploratory opening-up before the quote, not after]
[A named contingency line — not a surprise midway]
[Variations priced in writing before work proceeds]
[Payments against completed milestones only]
What we take on

Four kinds of renovation

Priced differently because the risk is different. Structural work is a different animal from a refresh.

Cosmetic refresh

[Paint, flooring, false ceiling, light fittings. No plumbing or wall changes.]

[2–4] weeks · lowest risk

Wet areas

[Bathrooms and kitchen. Waterproofing, plumbing shifts, tiling — where most renovations go wrong.]

[3–6] weeks · moderate risk

Full home

[Everything stripped back and rebuilt — layout changes, new electricals, all finishes.]

[8–16] weeks · high coordination

Structural

[Wall removal, slab openings, added floors. Requires a structural engineer's certificate and society or municipal approval.]

[12]+ weeks · approvals first
Renovation estimator

Including the contingency nobody else shows you

Renovation quotes go wrong because the contingency is hidden or absent. This one shows it as a line, sized by how old the building is and how deep the scope goes.

{{ areaLabel }}
{{ ageLabel }}
Scope
Finish level
Indicative all-in range
{{ rangeLabel }}
Base work{{ baseLabel }}
Rate applied{{ rateLabel }}
Contingency · {{ contingencyPctLabel }}{{ contingencyLabel }}
Est. duration{{ durationLabel }}
If you rent elsewhere{{ rentLabel }}
{{ verdict }}
Book a detailed survey

Indicative only. Furniture, appliances, approvals and society deposits are excluded. A fixed price follows the survey and opening-up.

Living through it

Can you stay in the house?

Sometimes, and it costs you comfort; sometimes not, and it costs you rent. Either way you should know before you sign, not in week three.

If you plan to stay, factor a [XX]% longer timeline — work in occupied homes stops for meals, sleep and society quiet hours.
Plan the sequence with us
Scope
Stay on site?
What's disrupted
[Cosmetic refresh]
[Yes]
[Room by room]
[One bathroom]
[Yes]
[That bathroom, [3] wks]
[Kitchen rebuild]
[Difficult]
[No cooking, [2–4] wks]
[All bathrooms together]
[No]
[Water off in zones]
[Full home]
[No]
[Everything, [8]+ wks]
[Structural]
[No]
[Vacant possession required]

Replace with your own real assessments. Society rules on work hours and dust often decide this more than the scope does.

What we find behind walls

  • [Old GI plumbing that must be replaced, not patched]
  • [Aluminium wiring or undersized cable for today's load]
  • [Failed waterproofing and seepage into the slab]
  • [Beams or columns that block the layout you wanted]

How variations are handled

  • [Photographed, priced and sent to you before work continues]
  • [Drawn from the contingency line first, with the balance shown]
  • [Your written approval, or we do not proceed]
  • [Timeline impact stated at the same time as the cost]

Work we turn down

  • [Structural changes without an engineer's certificate]
  • [Work without society or municipal permission in place]
  • [Tiling over failed waterproofing to save cost]
  • [Finishing a job another contractor abandoned mid-way, unsurveyed]
Recent renovations

Before, after, and what it cost

Drop in your own before/after pairs — same room on both sides. Each card states the quoted price, the final price, and why they differed.

Before
After
[Full home] · [XX]-yr-old flat, [Area]

[1,350] sqft, [XX] weeks

[What was found on opening up, what it added, and how the contingency absorbed it.]

Quoted [₹XX L] Final [₹XX L]
Before
After
[Wet areas] · [XX]-yr-old flat, [Area]

[2] bathrooms, [X] weeks

[What was found on opening up, what it added, and how the contingency absorbed it.]

Quoted [₹X.X L] Final [₹X.X L]
Before
After
[Structural] · [XX]-yr-old villa, [Area]

[Wall removal + rebuild], [XX] weeks

[Which approvals were needed, how long they took, and what the engineer's certificate changed.]

Quoted [₹XX L] Final [₹XX L]

“[A client quote about the moment something unexpected was found — and how it was communicated and priced. That is the whole product in renovation.]”

[Client Name][Scope], [Area] · completed [Month Year]
[XXX]+
Homes renovated
[XX]%
Within [10]% of quote
[XX]%
Finished on date
[4.X]
Google rating
Answers

Before you commit

Anything else, call [PHONE] or send photos of the rooms on WhatsApp for a rough read.

Send room photos

[Be precise: fixed price for surveyed scope, contingency for what is behind walls, variations only with written approval. Give your real track record as a percentage.]

[Describe the stop-and-report process, who decides, and the client's right to halt. Name the three things you find most often.]

[State what you file, what the owner must sign, deposits involved, and how work-hour restrictions affect the timeline.]

[Give the actual milestone percentages and what must be complete at each. Never ask for money ahead of work — say so plainly.]

[Yes / partly — and be clear about who carries the warranty, shortfall and delivery delay when the client supplies.]

[Separate workmanship from product warranty. Be explicit about waterproofing — it is the claim that matters most and the one most often excluded.]

Site visit & survey

We look behind the walls before we price

The first visit is free. For anything beyond cosmetic we then run a paid detailed survey — [₹XX,000], adjusted against the contract — because a fixed price you can rely on needs an honest look at the plumbing, wiring and waterproofing.

[First visit free. Survey fee adjusted if you proceed.]
[The survey report is yours to keep, even if you use someone else.]
[Visit an active site of ours before you sign anything.]
{{ leadHeadline }}
{{ leadMessage }}
CRM routing (demo)
Lead score{{ leadScore }}
Assigned to{{ leadOwner }}
Next action{{ leadAction }}

Illustrative only — wire the form to your CRM and replicate this scoring server-side.

Your details stay with us. No sharing with vendors or lead aggregators.
[Company Name]

© [YEAR] [Legal entity name]. All rights reserved.
[Office address, [City]] · [PHONE] · GSTIN [XXXXXXXXXXX]

Disclaimer: All rates, timelines, warranties, ratings and project figures shown are placeholders and must be replaced with verified information before publishing. The estimator is illustrative arithmetic, not a quotation — renovation cost depends on what the survey and opening-up reveal, and contingency is an estimate of risk, not a cap. Structural alterations require a qualified structural engineer's assessment and the relevant society or municipal approvals; nothing on this page substitutes for those. Project photographs must be replaced with your own work, or images you hold the licence to use. Rates exclude GST.

Call WhatsApp Site visit